
Possession
Under Construction

Price
42.99 Lacs

Size
1800 sq. ft.

Type
4 BHK Flats
Adore Prima 4 Bhk Flats Faridabad
- Project Area
- 4.5 Acres
- Total Tower
- 10 (4BHK), 6 (3 Bhk)
- Total Flats
- 224 (4 Bhk) - 56 Flats in 1 Tower
- Super Area
- 1800 Sq. Ft. (200 Sq, Yd)
- Cluster Plan
- 4
- Connectivity
- Situated on the 45-meter wide road
- Amenities
- Modular Kitchen, Light, Fans, Car Parking, Club, Park, 24x7 Security, Club House, Gym, Gated Community, 24x7 Power Backup, and many more...
- GST
- 5 %
- Possession Time
- 3.5 Years
About Project
Connectivity
Adore Prima Flats Price List
1st to 5th Floor | 44.99 Lakh |
---|---|
6th to 8th Floor | 44.49 Lakh |
8th to 10th Floor | 43.99 Lakh |
10th to 14th Floor | 42.99 Lakh |
Adore Prima Flats Payment Plan
TIME OF PAYMENT | PERCENTAGE OF THE TOTAL CONSIDERATION PAYABLE |
---|---|
At the time of Booking | 5 % of TP |
Within 45 days of submission of Booking | 10 % of TP |
At the start of excavation work | 10 % of TP |
At the start of the 1st Floor slab | 5 % of TP |
At the start of the 5th Floor slab | 5 % of TP |
At the start of the 10th Floor slab | 5 % of TP |
At the start of the Top Floor slab | 5 % of TP |
At the start of Internal Plaster Work | 10 % of TP |
At the start of Door frame & Window frame Work | 10 % of TP |
At start of Tile/Stone Work | 10 % of TP |
At the time of Possession | 25 % of TP |
Other Charges not included in TP: Stamp Duty, Registration Charges & GST Shall be Payable Extra. |
Indicative Terms & Conditions:
- All Payments are to be made through pay orders/ demand drafts drawn in favor of "Adore Homes LLP " Payable at Faridabad.
- Payment subject to realization of Cheque/ demand draft/RTGS.
- Stamp duty, registration charges, legal expenses, and other miscellaneous charges shall be separately borne and paid by the Applicant(s), as applicable at the time of registration of the sale deed.
SCHEDULE — B
FINAL SPECIFICATIONS
FLOORING | |
---|---|
Living/ Dining | Vitrified Tiles/ IPS |
Bedroom | Vitrified Tiles/ IPS |
Balcony | Ceramic Tiles/Class II |
Toilets | Ceramic Tiles/ IPS |
Kitchen | Vitrified Tiles/ IPS |
WALL FINISH | |
Living / Dining | Colour wash /Dry distemper/ Oil Bound distemper (OBD) |
Bedroom | Colour wash /Dry distemper/ Oil Bound distemper (OBD) |
Toilets | Colour wash /Dry distemper/ Oil Bound distemper (OBD) |
External | Colour wash /Dry distemper/ Oil Bound distemper (OBD) |
KITCHEN | |
Platform | Marble stone/Granite |
Wall Finish | Tiles up to 2 Feet from the Counter |
Others | Stainless Steel Sink (Singe Bowl) |
DOORS & WINDOWS | |
Door/Window Outer | MS Z- Section/ Fiber/UPVC/ Powder Coated Aluminum |
Door Frame | M.S./ Fiber Door Frames |
Doors | Moulded Skin Doors / Fiber Door / Flush Doors with enamel paint |
TOILETS | |
Walls | Ceramic Tiles |
CP Fittings | Standard Fittings |
Chinaware | Standard Fittings |
ELECTRICAL | |
Fittings | ISI Marked Wires, Switches and MCBs |
MISCELLANEOUS | |
Structure | Earthquake Resistant Structure |
Site plan
Coming Soon...

Location Map
Coming Soon...